Key Projects
Waitakere Central One
| Location: | Henderson, Auckland |
| Value: | $408,000 |
| Commencment: | September 2006 |
| Completion: | January 2007 |
| Status: | On time, to budget |
Packaged a/c units and variable air volume system wrapped up in an architecturally challenging A-grade office building – who could ask for more?!
Points to Note
Quite a difficult design / build project. The cutting-edge Normal, Disney & Young specification and superb Ignite Architects design certainly pushed the boundaries of our capabilities. Fortunately, our number one design engineer, Bruce, stayed one step ahead on the design front which really made a difference for the lads on site. A great all-round collaboration from the Chillex team on a very demanding project.
Key Contacts
Chillex Services
Project Manager: Graham Davis
Phone: (09) 625 9585
Project Manager: Graham Davis
Phone: (09) 625 9585
Macrennie Construction Limited
Site Manager: Bryce Caldwell
Phone: (09) 525 3330
Site Manager: Bryce Caldwell
Phone: (09) 525 3330
