Hilton Hotel
| Location: | Taupo |
| Value: | $1.29m |
| Commencment: | March 2009 |
| Completion: | November 2009 |
| Status: | On time, to budget |
A great opportunity for Chillex as the client was looking for a design / build solution and we had the answer.
Points to Note
Our brief was to provide an alternative design to the initial four-pipe fan coil system proposed that would offer significant savings to the client. We based our design on an old favourite, namely Mitsubishi Electric VRV, and were able to successfully meet both the original engineering specification and deliver the high standard of finish required by Hilton Hotels.
Key Contacts
Chillex Services
Project Manager: Cam Crawford
Phone: (09) 625 9585
Project Manager: Cam Crawford
Phone: (09) 625 9585
CMP Construction
Site Manager: Glenn Edmonds
Phone: 09 422 0937
Site Manager: Glenn Edmonds
Phone: 09 422 0937