Key Projects
LDS Temple, Tonga
| Location: | Tonga |
| Value: | $2.4m |
| Commencment: | September 2006 |
| Completion: | In Progress |
| Status: | On time, to budget |
An extremely complex and interesting project involving water chillers, hot water boilers, custom built air handlers, and VAV boxes – all located in a Tongan temple.
Points to Note
The brief was to construct a top of the range air conditioning system for the LDS church. Quality and product reliability were critical factors in selecting equipment. We have the benefit of the American engineering consultant (Van Boerum, Frank and Associates) expertise to guide us.
Key Contacts
Chillex Services
Project Manager: Chris McKeown
Phone: (09) 625 9585
Project Manager: Chris McKeown
Phone: (09) 625 9585
Cabella Pacific
Site Manager: John Walton
Site Manager: John Walton